K&P
![](https://mvc.on.ca/wp-content/uploads/2020/12/KP-Bridge-e1608213799583.jpg)
Posted on 10 February 2021 in News
Changes to K&P Bridge over the Clyde River
February 10, 2021 A five-tonne load limit has been imposed and other work carried out on the K&P Trail bridge…
More DetailsPosted on 10 February 2021 in News
February 10, 2021 A five-tonne load limit has been imposed and other work carried out on the K&P Trail bridge…
More Details