NOTICE OF FILING – CARP CREEK EMBANKMENT RESTORATION

NOTICE OF FILING OF DOCUMENT FOR REVIEW CARP CREEK EMBANKMENT RESTORATION CLASS ENVIRONMENTAL ASSESSMENT

The Mississippi Valley Conservation Authority (MVCA) has retained McIntosh Perry Consulting Engineers to complete a study regarding the Carp Creek Embankment Restoration located within Glen Cairn community between Terry Fox Drive and Eagleson Road. This project is being considered in order to provide protection to the Carp Creek embankment which is currently unstable due to severe erosion occurring primarily along the southeast embankment. This study has been initiated to solely address embankment erosion within the study area limits and will not address and/or rectify any recent flooding issues.

A Project Plan Report has been prepared in accordance with the Class Environmental Assessment for Remedial Flood and Erosion Control Projects, approved for projects of this type. As described in the Project Plan Report, MVCA, in cooperation with the City of Ottawa, is proposing to partially realign a portion of Carp Creek and place a live crib wall along the south embankment. Plantings and rip-rap will also be strategically placed to protect the top of banks and transition points along the creek. The Technically Preferred Alternative (TPA) will eliminate/reduce erosion of the embankment within the study area, which will help prevent the deposition of high levels of sediment into the tributary, as well as the erosion eventually extending into green space along Carp Creek which is situated immediately adjacent to residential properties and recreational facilities. Interested persons are invited to review this document on the Conservation Authority’s website at: http://mvc.on.ca or at the Conservation Authority office, 10970 Highway 7, Carleton Place. You may provide written comments to this office, within 30 calendar days from the date of this notice to:

 

 

John Price, Project Manager, Director, Water Resources Engineering
Mississippi Valley Conservation Authority
10970 Highway 7
Carleton Place, ON, K7C 3P1
Phone: 613-253-0006 Ext. 258
Fax: 613-253-0122
jprice@mvc.on.ca

Lisa Marshall, P. Eng.
McIntosh Perry Consulting Engineers Ltd.
Project Manager
115 Walgreen Road, R.R.3
Carp, Ontario, K0A 1L0
Phone: 613-836-2184 ext.2224
Fax: 613-836-3742
l.marshall@mcintoshperry.com

Subject to comments received as a result of this study and the receipt of necessary approvals and funding, MVCA intends to proceed with the construction of this project. If any individual feels that serious environmental concerns remain unresolved after consulting with Conservation Authority staff, it is their right to request that the project be subject to a Part II Order by the Minister of the Environment. Part II Order requests must be received by the Minister, with a copy to the Conservation Authority, at the following address within 30 calendar days (December 14th, 2018) following the date of this Notice:

Minister of the Environment
135 St. Clair Avenue West, 15th Floor
Toronto, Ontario
M4V 1P5

This notice issued November 15th and 29th, 2018.